• home
    • About Us
    • Contact
    • Terms and Conditions
  • Storage
    • Pallet Racking
      • Racking Identification
      • Accessories
        • Anti-collapse mesh
        • Barriers
        • Signage and labels
        • Load notices
      • Design considerations
    • Narrow Aisle
    • Drive-in
    • Cantilever Racking
  • Mezzanine
    • Mezzanine Design
    • Staircases
    • Building Regulations
    • Safety
  • Interiors
    • Steel Partitions
      • Excalibur double skin
      • Sabre single skin
      • Toledo Cleanroom
      • Mesh partitions
    • Suspended Ceilings
    • Flooring
    • Washrooms
    • Receptions
    • Furniture
  • Services
    • Installation
    • Racking Inspection
    • Fire Risk Assessment
  • Industrial Products
    • Storage Equipment
    • Warehouse & Distribution
    • Materials Handling
    • Workshop Equipment
    • Environmental & Safety
    • Office & Commercial
    • Facility Management
    • Site and Security
  • Projects
    • Warehouse Refurbishment
    • CDM
  • Facility Management
    • Loading docks
      • Dock shelter
      • Dock bumper
    • Air conditioning
    • Groundworks
    • Line marking
  • Sitemap
Building Regulations

Below are links to the most recent versions of the Approved Documents for the fourteen technical "Parts" of the Building Regulautions' requirements. Parts B, K and M are typically the only parts relevant to mezzanine floor construction.

Part A
Approved Document A - Structure (2004 edition)

Part B
Approved Document B - Fire safety (2000 edition consolidated with 2000 and 2002 amendments)

Part C
Approved Document C - Site preparation and resistance to contaminates and moisture (2004 edition)

Part D
Approved Document D - Toxic substances (1992 edition)

Part E
Approved Document E - Resistance to the passage of sound (2003 edition)

Part F
Approved Document F - Ventilation (2006 edition)

Part G
Approved document G - Hygiene (1992 edition)

Part H
Approved document H - drainage and waste disposal (2002 edition)

Part J
Approved document J - Heat producing appliances (1992 edition) 

Part K
Approved document K - Protection from falling collision and impact (1998 edition)

Part L - Buildings other than dwellings
Approved Document L2A: Conservation of fuel and power (New buildings other than dwellings) (2006 edition)

Approved Document L2B: Conservation of fuel and power (Existing buildings other than dwellings) (2006 edition) 
 
Part M
Approved document M - Access to and Use of Buildings (2004 edition)

Part N
Approved document N - Glazing (1998 edition)

Part P
Approved document P - Electrical safety (2006 edition)

All approved document content is  © Crown copyright 2006

 

Main Menu

  • home
  • Storage
  • Mezzanine
    • Mezzanine Design
    • Staircases
    • Building Regulations
    • Safety
  • Interiors
  • Services
  • Industrial Products
  • Projects
  • Facility Management
  • Sitemap

Pallet Racking, Cantilever Racking, Mezzanine Floors, Warehouse Refurbishment, Corby, UK


Dale Street, Corby, UK, NN17 2BQ
Tel: 01536 443822 | Fax: 01536 406883
Email: sales@pw-c.co.uk